Innovation. Openness. Professionalism.
Independent Technical Reviews
Professional, objective project reviewing
[flexy_breadcrumb]
Mine Planning & Design
Airport Planinng & Design
Geometric Design
Optic Fibre Solutions
Geotechnical & Pavements
Financial Modeling
Structural Engineering
Electrical Engineering
Water & Wastewater Engineering
Independent Technical Review
EPCM & Owners Team
Independent Technical Reviews
With our multi-disciplinary technical consultants and industry personnel, Nurizon has access to a wealth of expert knowledge within our market sector environments. We can assist clients with independent, infrastructure design reviews for projects. Whether it is for an investor looking to provide debt funding for a mine development, technical design compliance review of an airport engineering project, a value-engineering of designs or simply a backstop in terms of quality assurance, our personnel can assist.
Our project portfolio showcases a selection of our associated technical reviews projects.
Independent technical reviews
Independent technical reviews
Design standards compliance
Value-engineering
Quality assurance checks
Project Showcase

Melbourne International Airport, Australia
June 2014
Project:
Taxiway Victor South: Independent Technical Review
The Taxiway Victor South Program, undertaken by Aurecon for Australia Pacific Airports, was to provide new connectivity between existing taxiways through the extension of the existing Victor taxiway and the construction of Yankee Taxiway and Rapid Exit Taxiway (RET) Hotel. The project appointment included feasibility stage, schematic stage and detail design.

King Mswati III International Airport, Swaziland
Jun 2013 – ongoing
Project:
Master Plan and Business Plan Update: Independent Technical Review
King Mswati III International Airport in Swaziland was developed as the new international airport for the country, on a greenfields site approximately 40km east of Manzini and an hour’s drive from the capital city of Mbabane. The previous international gateway was Matsapha.

Boikarabelo Coal Project, South Africa
Jul 2012 – Oct 2012
Project:
Mine Development: Technical Review of Front-End Engineering Design
Coffey Mining (SA), together with a team of consultants (including Nurizon), was commissioned to undertake an independent technical review (ITR) of the Front-End Engineering Design (FEED) for the Boikarabelo Coal Project. The client was seeking to arrange a senior debt facility for the purpose of funding the development of the Boikarabelo Coal Mine project – a new 14.5Mt/a ROM production mine in the Waterberg Region of South Africa. The debt funding included the related infrastructure capex and working capital for the mine operations.