Mining
Integrated and sustainable mine infrastructure design
Mining Consultancy Services
Sector Overview →
Mining →
Airports →
Roads and Bridges →
Geotechnical →
Municipal Infrastructure →
Commercial, Indusstrial and Residential Development →
Bulk Water →
Rail and Ports →
Finanacial Services →
Bel Air Bauxite Mine
Project: Bankable Feasibility Study (BFS) 20211
Nurizon Consulting Engineers was appointed by Alufer Mining Ltd. to undertake a Bankable Feasibility Study (BFS) for the Bel Air Bauxite Mine development in Guinea, West Africa. This followed the 2012 Feasibility Study (FS) phase submission done by Nurizon. Alufer is an independent mining company focused on the development of bauxite resources in Guinea. The project is divided into two distinct geographical areas,
- Mining operation areas and transport corridor, which links the mining areas with the export facility.
- Export Facility, encompassing bulk materials handling, port loading and trans-shipping.
Scope of works on the project included:
- Mining – Conventional drill and blast and truck and shovel operations;
- Haulage – Material is transported from the mine pit to the Mine Support Area at the coast;
- Stacking and reclaiming – A 150,000t bulk storage facility;
- Loading – 2.3km causeway/trestle with longitudinal shiploader for charging transhipment barges;
- Transhipment – 15,000t, self-propelled and self off loading barges transport and load Panamax/Capesize vessels at the transhipment zone;
- Mine Support Area;
- Power and water utilities;
- The area houses all administrative complexes, fuel storage, power generation, stores and maintenance.
Elandspruit Coal Mine
Project: Mine Development: Feasibility Study and Owner’s Team Representation
Nurizon was contracted by the client to complete a feasibility study, addressing all civil, mining and electrical infrastructure designs, as well as compiling a financial model for a new greenfields coal mine in Mpumalanga, South Africa.
Project: Mine Development: Feasibility Study and Owner’s Team Representation
A site to the east of Delmas, part of the Central Witbank Coal Field, was identified by the client for the development of a new open-cast coal mine. It was estimated that the reserve would yield approximately 3 million tonnes of coal annually, with an estimated lifespan of 20 years.
Rietkuil Coal Mine, Mpumalanga
Project: Front-end Infrastructure Development: Detail Design
A site to the east of Delmas, part of the Central Witbank Coal Field, was identified by the client for the development of a new open cast coal mine. It was estimated that the reserve would yield approximately 3 million tonnes of coal annually, with an estimated lifespan of 20 years.



















